1A. SAP SD Certification Questions - AvaCheck, Basics, ERP NW SM

SAP SD Certification Questions - TEST 1 - Availibility Check

Please choose the correct statements from following  SAP SD Certification Sample Questions :

A. By availability check, you can come to know about material availability.
B. Availability check field is on Gen./Plant tab page in the customer master.
C. Like material determination, you MUST have to activate (Turn ON) availability check in the sales order.
D. System first performs forward scheduling to know the material availability.
E. The availability is checked on the material availability check.
F. System decides delivering plant in the following priority level : Material master the customer master and finally customer-material master.
G. During sales order, you CAN overwrite the plant.
H. Delivering plant on the material master is found in Sales : Sales ord. tab.
I. In customizing, you can not configure which elements are included in an availability check, according to transaction you are using.
J. Availability check is pre-requisite to carry our Transfer of Requirements.
K. Complete delivery or Partial delivery preferences AFFECT availability check results.
L. Material master contains information about weather partial deliveries are allowed.
M. Availability check includes current stock, planned inward movements, Forecast outward movements.
N. The system firstly carries out delivery scheduling (backward) based on the customer's requested delivery date and determines the material availability date. After this, it runs availability check for this date.
O. Availability check is done at Plant level. You can also at check other plant level.
P. Replenishment lead time (RLT) can't affect availability check.
Q. If quantity of an order item is not totally confirmed then an order item is backdated.
R. If the requested delivery date for an order item cannot be kept then an order item is backdated.
S. Backorder can be implemented only by rescheduling (not by manually).
T. MAD date must be determined by system before carrying out availability check.
U. Safety stock, Blocked stock, RLT, and Transit time -- you can find these options in SCOPE of availability check.
V. By selecting appropriate option, you can include storage locations in the availability check.
W. Availability check is carried out at sales area level.
X. Field entry in the ship to party is used as one of the determining factors in deriving the scope of availibility check.
Y. Availability check can only be done during quotation and sales order processing.
Z. RLT is stored on the forecasting screen of the material master.

SAP SD Certification Sample Questions ANS. aeghkmnoqrtv.




SAP SD Certification Questions - TEST 2 - Availibility Check



Find out the correct statements from following SAP SD Certification Sample Questions :

A. Availability check is GENERALLY switched off for KANBAN - relevant materials. bulk materials, slow-moving inventory materials.
B. There are ONLY two types of availability checks : 1. Check against Available-to-promise (ATP), 2. Check against planning.
C. You can maintain indicator to allow partial deliveries and allowed number of partial deliveries directly in the sales document's 'shipping tab' OR in the ''shipping tab'' of the customer master sales data view.
D. If partial deliveries are allowed, system MAY confirm two schedule lines for two different dates.
E. Requirement type can have more than one requirement types.
F. Requirement class 041 is Order/Delivery requirement class already present in system.
G. Requirement class is assigned to combination of item category and MRP type.
H. If MRP type if not available with given item category, then system uses only item category to determine requirement type.
I. You cannot deactivate requirement class and TOR at schedule line level.
J. VOV6 can also be used to activate availability check and transfer of requirement.
K. Checking group is specifically used to check material quantity available in plant.
L. By configuration of checking group (Total Sales Requirement column), you can choose system to generate and pass requirement to MRP from Monday of following week every week(summarized requirement).
M. Availability check and checking rule determines scope of availability check.
N. SAP's SD application predefines checking rule, you cannot change it.
O. You cannot select DEFAULT availability check by using combination of material type and plant.
P. Schedule line CN is deterministic MRP while CP is with no MRP.
Q. One way to select ''fixed date and quantity''  is by sales area.
R. You cannot turn on/off availability check for delivery item category.
S. You can define checking rule (A-sales order, B-delivery) for specific plant.
T. Availability check is ON and you enter the material in the sales order with quantity 50. But, enough quantity is not available of that material, then system will immediately show availability check overview screen.
U. Maximum partial deliveries allowed are 6.
V. During back order processing, you can give priority to order by different cafeterias.
W. You can set up the delivery block for a quantity confirmation with any number of days deferral. So, the system will consider no. of deferral days of lead time while confirming quantities in the sales order.
X. You can process a delivery with a 'zero' quantity only if it is permitted in delivery type customization.
Y. In the availability check overview screen (can be seen during sales order processing), system will give three options for to choose delivery : 1. One time delivery proposal, 2. Full delivery, 3. Partial delivery proposal.
Z. Co08 T.code provides availability overview for material/plant combination.

SAP SD Certification Sample Questions ANS. acdfhjlnqstvwxy.

2 comments:

  1. SAP-SD (Order Fulfillment) is one of the most important modules in SAP Software.There are several modules that SAP offers. The number os modules increases every year.
    http://eonlinetraining.co/course/sap-sd-online-training/

    ReplyDelete
  2. It was a very useful post about SAP SD certification questions as it giving the detailed info about sample questions for SAP SD certification questions.Reach now SAP SD Online Training in Hyderabad to learn SAP SD skills.

    ReplyDelete